How Your CPARS Score Impacts Future Contract Awards

Written by ISI | Oct 29, 2025 9:44:22 PM

Executive Brief 

In federal contracting, reputation is measurable. Your Contractor Performance Assessment Reporting System (CPARS) score reflects how well you deliver — and it heavily influences whether you win your next bid. 

This guide explains: 

  • How CPARS works and why it matters 
  • How past performance affects new awards 
  • Common pitfalls that lower scores 
  • Key CPARS changes coming under the 2026 National Defense Authorization Act (NDAA) 
  • Steps to strengthen your rating and stay competitive 

Dig deeper below to see why your CPARS score is more than a report card — it’s a contract-winning tool. 

Understanding CPARS and Why It Matters 

CPARS is the government’s formal record of contractor performance. Contracting Officers (COs) and Program Managers document your work across five key areas: quality, schedule, cost control, management, and regulatory compliance. 

Those evaluations feed into the Past Performance Information Retrieval System (PPIRS), used by the Department of Defense (DoD) and other federal agencies to evaluate vendors during source selection. A strong CPARS record signals reliability and reduces perceived performance risk, while poor ratings can eliminate you before price or technical merit are even considered. 

How CPARS Scores Influence Future Awards 

During source selection, Contracting Officers weigh past performance alongside technical and price factors under the Federal Acquisition Regulation (FAR) Part 15. 

  • Exceptional or Very Good ratings can offset a slightly higher price by demonstrating lower risk. 
  • Satisfactory ratings maintain eligibility but offer little competitive advantage. 
  • Marginal or Unsatisfactory ratings often disqualify a bidder outright. 

Federal evaluators must justify awarding a vendor with poor performance data. One bad project can stall your pipeline for years. 

Coming CPARS Reforms Under NDAA 2026 

The FY 2026 NDAA introduces a major overhaul of how contractor performance will be documented and scored. These reforms are still being phased in but are expected to roll out beginning in late 2026. 

Key proposed updates include: 

  • Shift to a “negative event” model: Evaluations will focus on material performance failures rather than traditional narrative ratings such as “Exceptional” or “Satisfactory.” 
  • Standardized incident categories: Negative events will be classified into defined areas like cybersecurity, manufacturing, and logistics failures. 
  • Weighted normalization: Scores will be adjusted for contract size and number of transactions, creating a more balanced comparison across contractors. 
  • Emphasis on absence of issues: A clean record without adverse events will carry more weight than subjective “Very Good” ratings. 
  • Legacy overlap: Contracts already under evaluation may continue using the current scale until closeout. 

What it means for contractors: 

  • Maintaining a clean compliance record becomes even more critical 
  • Strong internal documentation and quick issue resolution will prevent isolated incidents from escalating into reportable events 
  • Fewer subjective “gold-star” opportunities mean firms must focus on avoiding negative findings altogether 

Contractors should begin tracking potential risk events now — especially in cybersecurity and quality control — to prepare for this objective, data-driven model. 

Avoiding the Common CPARS Pitfalls 

Most poor CPARS outcomes are preventable. Frequent issues include: 

  • Incomplete or late deliverables 
  • Limited communication with Contracting Officers 
  • Poor subcontractor oversight 
  • Failure to meet compliance requirements like cybersecurity or safety standards 

Stay ahead by requesting interim reviews, maintaining clear records, and addressing issues before they reach the final evaluation. 

Improving Your CPARS Outcomes 

A strong CPARS record is built throughout contract execution, not just at the end. 

  • Request interim reviews to identify and resolve issues early. 
  • Document deliverables with clear evidence of compliance and schedule performance. 
  • Engage in the comment window: You have 14 days to respond to a draft CPARS before it’s finalized. 
  • Show continuous improvement by demonstrating how lessons learned translated into better results on subsequent contracts. 

Even modest improvements in responsiveness and communication can raise scores — and contracting confidence. 

Your CPARS record remains one of the most powerful indicators of your company’s reliability and performance. With the FY 2026 NDAA shifting evaluations toward objective, event-based reporting, contractors must focus on clean compliance, transparent communication, and proactive risk management. 

A consistent record free of reportable incidents will soon mean more than subjective “Very Good” marks. The time to prepare for this new scoring environment is now. 

 

 

FAQs 

What is the CPARS rating scale?

Under the current system, ratings range from Exceptional to Unsatisfactory across multiple factors. This will evolve under the NDAA 2026 reform into a negative-event tracking model. 

Can I challenge a CPARS rating?

Yes. You have 14 days to provide comments or supporting documentation before the evaluation becomes final. 

How long are CPARS reports retained?

Typically, three years for most contracts and up to six years for construction or architect-engineer projects. 

How does cybersecurity factor in?

With the link between CMMC 2.0 and CPARS under the 2026 reform, cybersecurity compliance will be a measurable element within “Regulatory Compliance” scoring. 